Loading and unloading and transshipment terminal

In order to sustainably develop the company’s activities and further expand it to implement the long-term goal of establishing a regional logistics center, starting from 2020, a terminal project covering an area of 120 hectares with services for loading, unloading, storing, transporting, transshipment, and transit of goods was started, covering an area of 7.6 hectares. dated October 19, 2020 of the head of the General Department of Customs was established by Order No.A/168, it is announced as a customs control zone, and the period is extended every 3 years in accordance with the appropriate procedure, and it is operating.

The customs control zone is:

  • 150 tons of cars and wagons
  • There are 2 sidings with 28 cars on one side
  • Bulk loading and unloading area
  • 76,000 square meters of designated compacted soil
  • Area for container reception and loading and unloading
  • Lighting, 24-hour security
  • It has a total of 24 cameras around the square
  • 3 ton forklift
  • 70 ton autocrane
  • It has equipment such as Kovsh (65D).
top